Software Engineering – Previous Year Questions
343 questions from past UGC NET Paper 2 – Computer Science papers, each with the correct answer. Open any question for its explanation.
- Match List – I with List – II. List – I (Propositions) (A) P ∧ (P → Q) (B) ¬(P ∨ Q) → (P ∧ Q) (C) P → Q (D) P ∨ (Q ∧ R) List – II (Disjunctive Normal Form) (I) P ∨ Q (II) (P ∧ ¬P) ∨ (P ∧ Q) (III) (¬P) ∨ Q (IV) (P ∧ P) ∨…
- Overfitting is expected when we observe that?
- Mr X designed open source software which must comply with some criteria. Choose the false statement in respect of above. (A) No restriction on redistribution of the software as part or whole (B) The integrity of the aut…
- Match List (I) with List (II): List I A. Product Complexity B. Structured System Analysis C. Coupling & cohesion D. Symbolic Execution List II I. System Requirements Design II. Software design III. Validation techniques…
- Suppose a cloud contains software stack such as Operating System, Application software, etc. This model is referred as _____ model.
- Which one of the following is not typically provided by Source Code Management Software?
- Which of the following super computers is the fastest?
- Which of the following statements about ERP system is true?
- Which of the following is not a Clustering method?
- Which of the given wireless technologies used in IoT, consumes the least amount of power?
- The distributed system is a collection of (P) and communication is achieved in a distributed system by (Q), where (P) and (Q) are:
- Which of the following statements is incorrect for Parallel Virtual Machine (PVM)?
- Which of the following is used to determine the cost performance index?
- Software project manager is responsible for the following task: (A) Project planning (B) Project status tracking (C) Resources management (D) Risk management (E) Project delivery within time & budget
- Fill in the blanks: "An ________ chart is a project schedule representation that presents the project plan as a directed graph. The critical path is the ________ sequence of ________ tasks and it defines the project ___…
- Which of the following are the primary objectives of risk monitoring in software project tracking? P: To assess whether predicted risks do, in fact, occur. Q: To ensure that risk aversion steps defined for the risk are…
- Which one of the following is a highly associated activity of project planning? (1) Keep track of the project progress. (2) Compare actual and planned progress and costs. (3) Identify the activities, milestones and deli…
- Consider the following statements: (A) Dynamic metrics are collected by measurements made of a program in execution (B) Static metrics are collected by measurements made of representations of the system (C) The assessme…
- Modifying the software to match change in the ever changing environment is called as
- Modifying the software by restructuring is called
- Software reliability is described with respect to (A) Execution Time (B) Calendar Time (C) Clock Time Choose the correct answer from the options given below:
- Statement I: "Quality control involves the series of inspections, reviews and tests used throughout the software process, to ensure each work product meets the requirements placed upon it." Statement II: "Quality assura…
- According to the ISO-9126 Standard Quality Model, match List-I with List-II: List-I (Attributes) (a) Functionality (b) Reliability (c) Efficiency (d) Maintainability List-II (Definitions) (i) Relationship between level…
- Software Reuse is ________.
- Software products need adaptive maintenance for which of the following reasons?
- Which of the following statements is/are true? P: Software Reengineering is preferable for software products having high failure rates, having poor design and/or having poor code structure. Q: Software Reverse Engineeri…
- A legacy software system has 940 modules. The latest release requires that 90 of these modules be changed. In addition, 40 new modules were added and 12 old modules were removed. Compute the software maturity index for…
- Software products need perfective maintenance for which of the following reasons?
- A software has been observed to crash 20 times during the year 2017 and each time it took 2 minutes to restart. What is the approximate availability of the software?
- Which of the following are the reasons for software re-engineering? P: Allow legacy software to quickly adapt to the changing requirements. Q: Upgrade to newer technologies/platforms/paradigm (for example, object-orient…