If 4 men or 6 women can do a piece of work in 12 days working 7 hours a day. How many days will it take to complete a work twice as large with 10 men and 3 women working together 8 hours a day ?
यदि 4 पुरुष या 6 महिलाएँ एक कार्य को 7 घण्टे प्रतिदिन कार्य करके 12 दिनों में कर सकते हैं, तो उसी कार्य से दुगुना बड़ा कार्य 10 पुरुष तथा 3 महिलाएँ 8 घण्टे प्रतिदिन कार्य करके कितने दिनों में पूरा कर सकेंगे ?
Pick an option to check yourself, or open the answer below.
Show answer & explanation
Correct answer: B. 7
Explanation
4 men = 6 women, so 1 man = 1.5 women. Work = 6 × 12 × 7 = 504 woman-hours; double = 1008. 10 men + 3 women = 18 women × 8 h = 144 per day → 7 days.
1 पुरुष = 1.5 महिला। कार्य = 6 × 12 × 7 = 504; दुगना = 1008। 10 पु + 3 म = 18 महिला × 8 = 144 प्रतिदिन → 7 दिन।
More Mathematics & Numerical Ability questions
- If x = 1/(1 + √2), then the value of x2 + 2x + 3 is :
- The perimeter of a rhombus is 100 cm and one of its diagonal is 40 cm. Then its area is :
- Two alloys are both made up of copper and tin. The ratio of copper and tin in the first alloy is 1 : 3 and in second alloy is 2 : 5. In wha…
- The difference between simple interest and the compound interest compounded annually at the rate of 12% per annum on ₹5,000 for two years w…
- The sum of two numbers is 520. If the bigger number is decreased by 4% and the smaller number is increased by 12%, then the obtained number…
- The sum of length, breadth and depth of a cuboid is 19 cm and its principal diagonal is 5√5 cm, then its surface area is :